The building will have 18 stories, and as a result, will soar above most of the buildings in the district capital on the Neckar and Enz rivers. SKY-Tower Bietigheim-Bissingen, Germany The “SKY” residential and commercial building is one of the highest construction projects the town of Bietigheim-Bissingen has ever seen. In the Erstfeld and Amsteg sections, the contractor used three formwork units, each with two 10-meterlong formwork carriages, for the cladding and tunnel lining. After the excavation support, a seal and an insituconcrete tunnel lining were installed. The entire base tunnel, including cross-passages and multifunction stations, is double-walled. Its route length of 57 kilometers through the Saint-Gotthard Massif between Erstfeld and Bodio makes the Gotthard Base Tunnel the longest rail tunnel in the world. Gotthard Base Tunnel, Switzerland The scheduled commissioning on December 11, 2016, marked the end of the project of the century – the Gotthard Base Tunnel – after nearly 20 years of building time.
Nemetschek Allplan 2015-1 (圆4) Multilingual 2.34 GB The software package Allplan provides a single tool design, which will be an invaluable asset to your project office or construction firm. SuperForge 2004 NCSS 2002 (NCSS) NCSS 2004 STATISTICAL ANALYSIS SYSTEM NE NASTRAN V8.3.
Only working nemetschek allplan 2009 rapidshare files.